Integral Grommet

Designed to seal openings in newly raised floor cutouts before the installation of communications or power cabling. Based on measurements at multiple data centers, on average 48% of valuable conditioned air is not reaching the air intake of IT equipment due to unsealed floor openings. This lost air, known as bypass airflow, contributes to IT equipment hot spots, cooling unit inefficiencies, and increasing infrastructure costs. KoldLok® products specifically address bypass airflow and its detrimental effects on data center cooling.

Part Number
1010  Grommet, Integral
MSRP: $79.00 (each)

 

SKU: 1010 Category: Tags: , , ,

Airflow Management Awareness Month

Our 6th annual Airflow Management Awareness Month webinar series has concluded. Watch the webinars on-demand now!

  • The Grommets contain no loose or partially fastened parts, which can become separated or fall through the raised floor
  • The Grommets are impact resistant and durable
  • The Grommets satisfy NFPA 75 Section 5-4.4 requirement by self-dressing the raw metal edges of raised-floor tile cable cutouts
  • KoldLok products are compliant with Directive 2002/95/EC of the European Parliament and the Council on the Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment (RoHS)
  • Increases existing cooling unit capacity Reduces the need to purchase additional cooling units
  • Improves equipment reliability and extends equipment life
  • Increases static pressure under the raised floor and improves cool air delivery through perforated tiles and floor grates
  • Facilitates Cold Aisle/Hot Aisle best practices
Fire RatingRoHS Compliance
UL 94 HBYes

Pin It on Pinterest