KoldLok Certified Product Testing Report

This paper contains a product testing report by the Uptime Institute of supervised performance testing of the KoldLok Integral Raised Floor Grommet, Model 1010. The testing program had three objectives: 1) What is the KoldLok grommet’s sealing effectiveness in preventing the loss of cooling are? 2) How capable is the Koldlok grommet in conducting static charge on the raised floor? And 3) Is the 4″ by 8″ net usable opening size of the KoldLok grommet sufficiently large to accommodate the density of cable concentrations likely to occur at most sites?